Disclaimer    Site Map    Careers    Media Centre    Contact    About us
Search

creating better environments
Flex Design Installation

For the best result, we recommend professional installation. Before installation, the subfloor must be permanently dry, smooth, level, clean and of sound construction. The planks and tiles must be allowed to condition at 18 °C - 27 °C for 24 hours before installation and the temperature should be maintained during laying.
 
 
Before installation, the sub floor must be dry, rigid and smooth. Leveling is required when this is not the case.
 
 
Ascertain the center of the room by drawing two perpendicular lines on the floor. 
 
Place the Flex Design tile or plank on the floor, on top of the tackifier. 
 
When approaching the wall draw the required correct size of the tile or plank.